Home / Worked example
Last reviewed 2026-10-30

Estimator Worked Example

One run of the Electric Panel Cost estimator, line by line: the inputs, each published range, and the total.

Worked example: the estimator with these inputs: 6 AFCI or GFCI breakers needed (only if ticked); Region cost level (est. multiplier): Average US; items: Replace with a 200-amp panel, installed (Angi), Permit and inspection (Angi, This Old House). Each line is the published range times the quantity where it applies, times the multipliers, rounded to the nearest $10.

Line itemRange
Replace with a 200-amp panel, installed (Angi)$1,300 – $2,000
Permit and inspection (Angi, This Old House)$50 – $300
Estimated total$1,350 – $2,300

Your own numbers will differ. Run the estimator with your inputs, and see the methodology for where each range comes from. Guides: Electrical Panel Replacement Cost, Electrical Panel Upgrade Cost: 100 to 200 Amps and Beyond, Federal Pacific (FPE) Panels: Risk and Replacement Cost.

Free, no obligation

Get matched with a licensed electrician

Tell us about the project. A member of our team will reply by email with next steps and, where we know them, local licensed and insured contractors to contact. Your details are used only for this request and never sold to data brokers.

Use the estimate above as your yardstick. A fair bid should list the panel, permit and any meter or service work separately.